: The installation guide for the ECS 950 control unit involves unhooking the door, positioning it 1.5 m above the ground, and marking a position 1 m above the floor on the door frame for setup.
: The installation guide for the ECS 950 control unit involves unhooking the door, positioning it 1.5 m above the ground, and marking a position 1 m above the floor on the door frame for setup.